Skill: Retro Enforcement
Purpose
Ensure retrospectives happen on schedule and that their action items are tracked in GitHub Issues — not markdown checklists.
This skill addresses a specific, measured failure mode: 0% completion rate on markdown retro action items across 6 consecutive retrospectives. GitHub Issues have an 85%+ completion rate in the same squad. The format was the problem, not the people.
Core Function: Test-RetroOverdue
function Test-RetroOverdue {
param(
[string]$LogDir = ".squad/log",
[int]$WindowDays = 7,
[string]$Pattern = "*retrospective*"
)
$cutoff = (Get-Date).AddDays(-$WindowDays)
$retroLogs = Get-ChildItem -Path $LogDir -Filter $Pattern -ErrorAction SilentlyContinue |
Where-Object { $_.LastWriteTime -ge $cutoff }
return ($retroLogs.Count -eq 0)
}
Returns
$true— No retro log found within the window. Retro is overdue. Block other work.$false— At least one retro log found within the window. Proceed normally.
Detection Logic
The function checks .squad/log/ for any file matching *retrospective* dated within the last $WindowDays days (default: 7). If none is found, the retro is overdue.
File naming convention: .squad/log/{ISO8601-timestamp}-retrospective.md
Example: .squad/log/2026-03-24T14-45-00Z-retrospective.md
Coordinator Integration
Call Test-RetroOverdue at the start of every round, before building the work queue.
# At round start — before any work queue construction
if (Test-RetroOverdue -LogDir ".squad/log" -WindowDays 7) {
Write-Host "[RETRO] Retrospective overdue. Running before other work."
# Spawn retro facilitator
Invoke-RetroSession -Mode "catch-up"
# Wait for retro log to be written
# Then resume normal round
}
# Proceed with normal work queue
$workQueue = Get-PendingIssues | Sort-Object -Property Priority
Blocking Semantics
When Test-RetroOverdue returns $true:
- Do not start any other work until the retro completes
- Spawn the facilitator agent (Scribe or designated) with retro mode
- Wait for the log file to be written to
.squad/log/ - Verify action items were created as GitHub Issues (not markdown)
- Resume normal round after retro log confirmed
Action Item Enforcement
Every retro action item MUST become a GitHub Issue. The facilitator agent is responsible for this. The coordinator verifies.
Verification Check
function Test-RetroActionItemsCreated {
param([string]$RetroLogPath)
$content = Get-Content $RetroLogPath -Raw
# Check for Issue references (e.g., #1478, https://github.com/.../issues/1478)
$issueRefs = [regex]::Matches($content, '(?:#\d{3,}|issues/\d{3,})')
# Check for unclosed markdown checkboxes (bad pattern)
$openCheckboxes = [regex]::Matches($content, '- \[ \]')
if ($openCheckboxes.Count -gt 0) {
Write-Warning "[RETRO] Found $($openCheckboxes.Count) markdown checkboxes — convert to Issues"
return $false
}
return ($issueRefs.Count -gt 0)
}
Why Not Markdown Checklists
From production data in tamirdresher/tamresearch1:
| Retro | Action Items Format | Completion |
|---|---|---|
| 2025-12-05 | Markdown - [ ] |
0/4 = 0% |
| 2025-12-19 | Markdown - [ ] |
0/3 = 0% |
| 2026-01-09 | Markdown - [ ] |
0/5 = 0% |
| 2026-01-23 | Markdown - [ ] |
0/4 = 0% |
| 2026-02-07 | Markdown - [ ] |
0/3 = 0% |
| 2026-02-21 | Markdown - [ ] |
0/4 = 0% |
| 2026-03-24 | GitHub Issues | 4/4 = 100% (after enforcement) |
Root cause: Markdown checklists have no assignee, no notifications, no close event, and no query surface. They are invisible to every workflow that drives completion.
Cadence Enforcement
Recommended schedule
- Weekly squads: window = 7 days
- Bi-weekly squads: window = 14 days
Ralph integration example
# ralph-watch.ps1 — round start hook
function Invoke-RoundStart {
# 1. Always check retro first
if (Test-RetroOverdue -LogDir "$RepoRoot/.squad/log" -WindowDays 7) {
Write-Host "[RALPH] Retro overdue — enforcing before work queue"
Invoke-RetroSession
return # Re-enter round after retro completes
}
# 2. Normal work queue
$issues = Get-ReadyIssues
foreach ($issue in $issues) {
Invoke-WorkItem -Issue $issue
}
}
Skill Metadata
| Field | Value |
|---|---|
| Skill ID | retro-enforcement |
| Category | Ceremonies / Process |
| Trigger | Coordinator round start |
| Dependencies | .squad/log/ directory, GitHub Issues API |
| Tested in | tamirdresher/tamresearch1 (production, March 2026) |
| Outcome | Retro cadence restored; action item completion 0% → 100% |